Skip to content

Commit 077dbe3

Browse files
end of day 03.31.2026
1 parent bfed4c7 commit 077dbe3

14 files changed

Lines changed: 109 additions & 18 deletions

.DS_Store

2 KB
Binary file not shown.

brain.md

Lines changed: 3 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -1,16 +1,15 @@
11
# 📊 CAPACITY STATUS
2-
[Progress Bar: ██████████] 458% of weekly capacity used. Weekly burn: 183h / 40h.
2+
[Progress Bar: ██████████] 438% of weekly capacity used. Weekly burn: 175h / 40h.
33

44
# 🚀 ACTIVE PROJECTS
5-
- [ ] IFWH-01 Accessibility audit + remediation | [4h] | Status: On Track | Due: 2026-03-27
5+
- [ ] IFWH-02 Content alt text completion | [1h] | Status: On Track | Due: 2026-04-01
66
- [ ] NWAC-01 Final documentation + compliance research | [10h] | Status: On Track | Due: 2026-03-27
77
- [ ] MASC-16 Source newer MASC dataset files | [1h] | Status: On Track | Due: 2026-03-27
88
- [ ] MASC-04 News and Updates regression + coin review | [4h] | Status: Triage Needed
99
- [ ] MASC-07 Staging feedback remediation backlog beyond current tracked MASC scope | [55h] | Status: Triage Needed
1010
- [ ] MASC-08 Circular bin volume calculator widget + Insurance with MASC page update | [4h] | Status: Behind | Due: 2026-03-25
1111
- [ ] MASC-12 Overview hero program image size increase | [2h] | Status: Triage Needed
1212
- [ ] MASC-13 Overview nav gradient accessibility fix | [3h] | Status: Triage Needed
13-
- [ ] MACY-01 Recommended Tracking CPT refactor | [5h] | Status: On Track | Due: 2026-03-27
1413
- [ ] BANF-01 MI_308 internal wording decision | [1h] | Status: Triage Needed | Due: 2026-03-27
1514
- [ ] BANF-02 MI_310 internal UX decision | [1h] | Status: Triage Needed | Due: 2026-03-27
1615
- [ ] BANF-03 MI_313 return-to-map decision | [1h] | Status: Triage Needed | Due: 2026-03-27
@@ -30,7 +29,7 @@
3029
- None
3130

3231
# 📝 EXECUTIVE SUMMARY (Copy for Slack)
33-
"Currently focusing on `IFWH-01`, `NWAC-01`, and a short `MASC-16` unblock so this week's closeout work lands before Banff takes over next week. `MASC-08` is still behind because it needs design and client input before implementation can continue. The portfolio remains behind at 183h against a 40h week because MASC remediation, Banff release work, and several owner-dependent follow-ups are still open across MASC, Banff, `MACY-01`, NWAC, Encore Cabinets, Orbeon Forms, and `UA Local 179`."
32+
"Currently focusing on `NWAC-01`, the short `IFWH-02` content closeout, and Banff release work now that IFWH technical remediation is complete. `MASC-08` is still behind because it needs design and client input before implementation can continue. The portfolio remains behind at 175h against a 40h week because MASC remediation, Banff release work, and several owner-dependent follow-ups are still open across MASC, Banff, NWAC, Encore Cabinets, Orbeon Forms, and `UA Local 179`."
3433

3534
# ❓ UNBLOCK ME (Action required by Developer)
3635
1. For MASC-04, is the News and Updates regression item part of the current March 20, 2026 sprint or should it be handed off after the current MASC work closes?

daily-plans/monday-2026-03-30.md

Lines changed: 28 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,28 @@
1+
# Monday Plan - 2026-03-30
2+
3+
## First Block
4+
- Move directly into `IFWH-01`.
5+
- Goal: close the accessibility audit and remediation lane so it stops carrying into Banff week.
6+
7+
## Second Block
8+
- Move directly into `NWAC-01`.
9+
- Goal: push the client-handoff documentation to a closeout-ready state and reduce the risk that NWAC keeps spilling.
10+
11+
## Third Block
12+
- Move directly into Banff release work:
13+
- `BANF-07`
14+
- `BANF-08`
15+
16+
## Short Admin Block
17+
- Send the `AMIK-01` follow-up if there is still no response.
18+
19+
## Float Block
20+
- If the carryover closeout lane lands cleanly and Banff release work is stable, use remaining time on:
21+
- `BANF-05`
22+
- `BANF-06`
23+
- `MASC-16` only if the newer dataset files are immediately available and the unblock stays truly short
24+
25+
## Guardrails
26+
- Do not let MASC remediation reopen as the main lane today.
27+
- Treat `IFWH-01` and `NWAC-01` as overdue carryover that must be reduced before Banff expands further.
28+
- Keep Banff as the main protected execution lane once the carryover closeout work is handled.

daily-plans/monday-2026-03-30.pdf

16.3 KB
Binary file not shown.

daily-plans/tomorrow-2026-03-27.md

Lines changed: 0 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -14,7 +14,6 @@
1414
- `MASC-D03` follow-through from the `2026-03-26` meeting
1515
- `MASC-12`
1616
- `MASC-13`
17-
- `MACY-01`
1817

1918
## Guardrails
2019
- Keep `IFWH-01` and `NWAC-01` protected so they close this week and do not spill into Banff's hard-deadline week.

daily-report-2026-03-17.md

Lines changed: 9 additions & 8 deletions
Original file line numberDiff line numberDiff line change
@@ -1,8 +1,8 @@
11
# Daily Report - 2026-03-17
22

33
## 📊 Capacity
4-
- Weekly burn: 183h / 40h
5-
- Portfolio load: 458% of weekly capacity
4+
- Weekly burn: 178h / 40h
5+
- Portfolio load: 445% of weekly capacity
66
- Near-term delivery window: MASC due 2026-03-20, Banff release due 2026-03-31, Banff feedback update due 2026-04-03
77

88
## 🟢 What's Done
@@ -29,6 +29,8 @@
2929
- `MASC-15` was completed on 2026-03-26.
3030
- `MASC-11` was completed on 2026-03-26.
3131
- `MASC-03` was completed on 2026-03-26.
32+
- `MACY-01` was completed on 2026-03-27; the recommendation changes are now closed.
33+
- `IFWH-01` was completed on 2026-03-31; all technical accessibility remediation is now closed.
3234
- The MASC `2:00 PM` sync on 2026-03-26 was completed and the notes were captured into the tracker.
3335
- `LFMP-01` for the local `leaflet-maps-plugin` was completed on 2026-03-23; the bailout bug is resolved and the functionality is reported as working as expected.
3436
- `BANF-09` audio-cleanup recommendation reply was completed on 2026-03-20.
@@ -39,11 +41,13 @@
3941
- Banff response handling for the current Michel Technical Lead feedback is complete as of 2026-03-18, with all `37` comments acknowledged in Asana.
4042

4143
## 🟡 What's In Progress
44+
- `2026-03-30` progress note: met with Alex to check in on the responsiveness sections handoff and made meaningful progress on `IFWH-01`, but the accessibility remediation lane is still open.
45+
- `IFWH-02` is now the only remaining IFWH follow-up: content-based alt text is pending and targeted for `2026-04-01`.
46+
- `2026-03-31` MASC response note: about `2h` went into resolving dynamic scripting queries and sending the required follow-up responses after a pile-up of outstanding questions.
4247
- New maintenance queue item: `UA Local 179` mobile app compatibility check for Samsung Galaxy S7 devices, estimated at 3h and currently waiting on deadline, priority, and test-environment details.
4348
- Next week closeout: complete `IFWH` accessibility audit and remediation updates by Friday, 2026-03-27.
4449
- Next week closeout: complete `NWAC` final documentation and compliance research by Friday, 2026-03-27.
4550
- Priority reset on 2026-03-25: `IFWH-01` and `NWAC-01` now need to close this week so the week of `2026-03-30` can be protected for Banff's hard deadline.
46-
- Next week scheduled item: `MACY-01` is approved to proceed, stays owned by Aaron for now, carries an internal follow-up on Wednesday, 2026-03-25, has an internal target date of Friday, 2026-03-27, and now explicitly includes data backfill plus a short update note for the new post type workflow.
4751
- New project intake: `IDE-01` is a bounded 1h support reply for tomorrow to help the client update the `Initiative Hero` circular image and the `Download Brochure (PDF)` button on the IDE Canada site.
4852
- New MASC float item: `MASC-12` is a 2h visual update to increase the size of the overview hero program images without turning it into a broader hero redesign.
4953
- New MASC float item: `MASC-13` is a 3h accessibility-related fix to restore the dark gradient treatment under the nav on overview landing pages where it appears to be missing.
@@ -80,7 +84,6 @@
8084
- Orbeon Forms is waiting on client field definitions.
8185
- The Orbeon historical survey export is complete, but the CSV is still waiting on sharing information before handoff.
8286
- The Orbeon GitLab repo is stale and would need to move to GitHub, but that remains a separate maintenance item from the completed survey-data export.
83-
- `MACY-01` is approved to proceed and scheduled for next week, but the confirmed backfill and short write-up raise the internal planning estimate beyond the original client-facing 3h and it may still be handed off midweek if a clean plan and available owner appear.
8487
- NWAC documentation is now confirmed as a client handoff, but compliance framing decisions still need to be pinned down so the final package does not stall.
8588
- `UA Local 179` has been added as a new maintenance item, but it still needs a target date, relative priority, and confirmation of whether the Samsung Galaxy S7 check will use a physical device or an emulator.
8689
- Banff remediation still includes asset dependencies around SVG logo files; `MI_311` and `MI_312` specifically need to be flagged to the PO and content collection team because the DMC logo should be SVG-only and sponsor logos should be acquired or created as SVGs to avoid blurry rendering at some sizes, zoom levels, and high-DPI screens.
@@ -108,7 +111,7 @@
108111

109112
## Queue Snapshot
110113
- This week: MASC
111-
- Next active work: IFWH closeout, NWAC closeout, MACY-01, Banff technical remediation, Banff release prep, IPAM
114+
- Next active work: IFWH closeout, NWAC closeout, Banff technical remediation, Banff release prep, IPAM
112115
- Protection note: after the current MASC due-today lane, protect the rest of this week for `IFWH-01` and `NWAC-01` so next week can be reserved for Banff.
113116
- New maintenance intake: UA Local 179 Galaxy S7 compatibility check
114117
- Current MASC next steps: route Jordan-owned plugin items and content-owned fixes to the right owners and get French translations for the featured block content on the French `MMPP` page.
@@ -126,7 +129,6 @@
126129
- Capacity queue: Encore Cabinets, AMIK
127130
- Next week follow-up: if no AMIK response is received by Monday, 2026-03-30, send a check-in and confirm whether `ENH-001` stays parked until capacity opens
128131
- Waiting on client: Orbeon Forms
129-
- Next week follow-up: check `MACY-01` status and handoff options by Wednesday, 2026-03-25
130132
- Documentation queue: NWAC
131133

132134
## Rest Of Week - 2026-03-18 To 2026-03-20
@@ -141,7 +143,6 @@
141143
- End of day 2026-03-20: `MASC-02` remained open and now carries into Monday, 2026-03-23.
142144
- Completed on Monday, 2026-03-23: `MASC-06` was closed and the internal sync ran as planned before returning to the remaining MASC lane.
143145
- Next week, work `IFWH` ahead of `Banff` because the IFWH closeout date lands first on 2026-03-27.
144-
- During the week of 2026-03-23, keep `MACY-01` on Aaron's list as the owner, follow up internally by Wednesday, 2026-03-25, and aim to close the work by Friday, 2026-03-27 unless a clean handoff becomes available first.
145146
- Completed on 2026-03-25: `MASC-05` was closed, and the responsive tasks were broken out and handed off to Alex.
146147
- Merge current MASC work to the production site on 2026-03-18.
147148
- Use the remaining execution time this week on routing the new MASC cleanup bundle, plugin-owned items, and content-owned follow-ups after the archive-page work.
@@ -155,4 +156,4 @@
155156
- Keep the `MI_330` alt-text reminder visible so content collection closes image metadata gaps before submission.
156157

157158
## Slack Update
158-
Today's closeout was steadier than yesterday: `MASC-03`, `MASC-11`, and `MASC-15` all closed, and the `2:00 PM` MASC sync clarified the next remediation lane and launch timing. Tomorrow stays protected for `IFWH-01` and `NWAC-01`, with only a short `MASC-16` unblock to source the newer dataset files; the main structural risk is still capacity, with the board now at `183h / 40h`.
159+
Monday closeout was progress-heavy rather than delivery-heavy: the main movement was `IFWH-01`, and there was also an internal Alex check-in on the responsiveness handoff. No new scope entered the board, but the key risk remains the same: `IFWH-01` and `NWAC-01` are still open while Banff week is already active.

ifwh.md

Lines changed: 7 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -3,12 +3,12 @@
33
## Project Snapshot
44
- Source: `Workload Metrics - Main.csv`
55
- Load: Low
6-
- Working estimate: 4h total remaining
6+
- Working estimate: 1h total remaining
77
- Task code prefix: `IFWH`
88
- Priority: Raised above Banff for next week
99
- Start date: 2026-03-19
1010
- Deadline: 2026-03-27
11-
- Status: Next Week Closeout
11+
- Status: Content Closeout
1212

1313
## Current State
1414
- The main project work is complete
@@ -17,9 +17,13 @@
1717
- Scheduling note: this project is now targeted for closure during the week of `2026-03-23`, with completion due by Friday, `2026-03-27`
1818
- Priority note: `IFWH` now sits ahead of `Banff` in next week's execution order because its closeout date lands first.
1919
- Protection note on `2026-03-25`: `IFWH-01` must be closed this week so the week of `2026-03-30` can stay protected for Banff's hard deadline.
20+
- Progress note on `2026-03-30`: meaningful remediation work moved forward, but `IFWH-01` did not fully close.
21+
- Completion note on `2026-03-31`: all technical remediation is now complete.
22+
- Remaining scope note on `2026-03-31`: content-owned alt text is still pending and is expected to be finished tomorrow.
2023

2124
## Remaining Task
22-
- [ ] IFWH-01 Accessibility audit + remediation | Estimate: 4h | Due: 2026-03-27
25+
- [x] IFWH-01 Accessibility audit + remediation | Completed: 2026-03-31
26+
- [ ] IFWH-02 Content alt text completion | Estimate: 1h | Due: 2026-04-01
2327

2428
## PM Notes
2529
- Scope is now narrow and well-defined

index.md

Lines changed: 4 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -10,6 +10,8 @@
1010
- [masc/masc.md](./masc/masc.md)
1111
- [masc/masc-architecture.md](./masc/masc-architecture.md)
1212
- [masc/masc-board.md](./masc/masc-board.md)
13+
- [masc/masc-claims-reporting-internal-brief-2026-03-27.md](./masc/masc-claims-reporting-internal-brief-2026-03-27.md)
14+
- [masc/masc-claims-reporting-internal-brief-2026-03-27.pdf](./masc/masc-claims-reporting-internal-brief-2026-03-27.pdf)
1315
- [masc/masc-new-feedback-sort-2026-03-23.md](./masc/masc-new-feedback-sort-2026-03-23.md)
1416
- [masc/masc-new-feedback-sort-2026-03-23.pdf](./masc/masc-new-feedback-sort-2026-03-23.pdf)
1517
- [masc/masc-responsiveness-qa-checklist-2026-03-25.md](./masc/masc-responsiveness-qa-checklist-2026-03-25.md)
@@ -33,6 +35,8 @@
3335
- [daily-plans/](./daily-plans/)
3436
- [daily-plans/monday-2026-03-23.md](./daily-plans/monday-2026-03-23.md)
3537
- [daily-plans/monday-2026-03-23.pdf](./daily-plans/monday-2026-03-23.pdf)
38+
- [daily-plans/monday-2026-03-30.md](./daily-plans/monday-2026-03-30.md)
39+
- [daily-plans/monday-2026-03-30.pdf](./daily-plans/monday-2026-03-30.pdf)
3640
- [daily-plans/tomorrow-2026-03-18.md](./daily-plans/tomorrow-2026-03-18.md)
3741
- [daily-plans/tomorrow-2026-03-18.pdf](./daily-plans/tomorrow-2026-03-18.pdf)
3842
- [daily-plans/tomorrow-2026-03-19.md](./daily-plans/tomorrow-2026-03-19.md)

macy.md

Lines changed: 6 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -8,10 +8,10 @@
88
- Priority: Low
99
- Start date: 2026-03-23
1010
- Deadline: 2026-03-27
11-
- Status: Scheduled next week
11+
- Status: Complete
1212

1313
## Current Task
14-
- [ ] MACY-01 Recommended Tracking CPT refactor | Estimate: 5h | Due: 2026-03-27 | Owner: Aaron | Internal follow-up: 2026-03-25 | Handoff: plan when possible
14+
- [x] MACY-01 Recommended Tracking CPT refactor | Completed: 2026-03-27
1515

1616
## Issue Summary
1717
- The `Recommended Tracking` page is failing to load and save reliably because the tracking block currently stores too much data directly in page content.
@@ -54,5 +54,9 @@
5454
- Internal follow-up: check status and handoff options by Wednesday, `2026-03-25`.
5555
- Planning assumption: keep Aaron as owner for now and hand off only if a clean plan and capacity become available midweek.
5656

57+
## Completion Note
58+
- Recommendation changes are complete as of `2026-03-27`.
59+
- The `Recommended Tracking` CPT refactor, backfill, current-page block support, and short update note are now treated as closed work.
60+
5761
## Notes
5862
- Original project shell came from `Workload Metrics - Main.csv`.

masc/masc-board.md

Lines changed: 2 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -22,6 +22,7 @@
2222
- Current rollout note on 2026-03-19: the featured thematic crop maps block has been added to the English `MMPP` page and the French-side page; French translations for the block content still need to be supplied by the content team.
2323
- [x] Review EN feedback and capture follow-on scope | Completed: 2026-03-19
2424
- [x] Evaluate dynamic script requirements and next steps | Completed: 2026-03-19
25+
- Response note on `2026-03-31`: about `2h` was spent resolving dynamic scripting queries and sending the required follow-up responses after a pile-up of outstanding questions.
2526
- [x] Update archive page info cards to showcase coin categories for year, crop, and map type | Completed: 2026-03-19
2627
- [x] MASC-01 Missing calculator values | Completed: 2026-03-20
2728
- Delivery note on 2026-03-19: the archive-page category coin pattern update was completed and deployed to production.
@@ -193,6 +194,7 @@
193194
- Delivery note: the remediation plan should be built collaboratively with Aaron and should include owner assignment and sequencing recommendations, not just notes from the Alex conversation.
194195
- Prep note: if execution time remains at the end of Friday, `2026-03-20`, use it to sketch inputs for the Monday, `2026-03-23` sync rather than starting another unrelated MASC workstream.
195196
- Update on `2026-03-25`: the responsiveness sync is complete, the responsive tasks were broken out, and the remediation lane was handed off to Alex.
197+
- Update on `2026-03-30`: a check-in with Alex was completed to review progress on the handed-off responsiveness sections.
196198

197199
## FR Review Note
198200
- Mike has now provided the French version of the MASC logo.

0 commit comments

Comments
 (0)