Skip to content

[Docs] Post-OP-Stack migration: obsolete references and missing post-deadline guidance #1395

@lau90eth

Description

@lau90eth

Summary

Following Base's exit from Optimism's OP Stack (Feb 2026) and the April 9 migration deadline for Farcaster mini-apps, I found several docs inconsistencies.

Issues Found

  1. Obsolete OP Stack reference in fee docs

    • Page: /base-chain/network-information/network-fees
    • Text links to "op-stack developer documentation"
    • Base now runs the unified base/base stack
  2. Missing post-deadline guidance in migration guide

    • Page: /apps/quickstart/migrate-to-standard-web-app
    • Deadline was April 9, 2026
    • No section explaining what happens to unmigrated apps (grace period? hard stop? error messages?)
  3. README base/node still claims "built on Optimism's OP Stack"

    • Should reflect the unified stack architecture
  4. README base/contracts says "utilizes Optimism's bedrock contracts"

    • Needs clarification post-migration

Suggested Fixes

  • Update fee docs to reference Base's own fee mechanics or clarify OP Stack heritage
  • Add "Post-April 9" FAQ to migration guide
  • Update base/node and base/contracts READMEs to reflect current architecture

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions