docs: update version references to 0.0.5-next-1 #98
main.yaml
on: pull_request
Quality (lint/format)
15s
Security (deps audit)
11s
Matrix: test-build
Annotations
7 errors
|
Test + Build (Node 22)
Canceling since a higher priority waiting request for ci-refs/pull/30/merge exists
|
|
Test + Build (Node 22)
The operation was canceled.
|
|
Test + Build (Node 24)
Canceling since a higher priority waiting request for ci-refs/pull/30/merge exists
|
|
Test + Build (Node 24)
The operation was canceled.
|
|
CI
Canceling since a higher priority waiting request for ci-refs/pull/30/merge exists
|
|
Test + Build (Node 20)
Canceling since a higher priority waiting request for ci-refs/pull/30/merge exists
|
|
Test + Build (Node 20)
The operation was canceled.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
ctrf-test-report-node-20
|
6.99 KB |
sha256:8a87f34c6f392ea4441f76c4e8d58b1e377b1c87d1a29c662d8bd97d339a74fe
|
|
|
ctrf-test-report-node-22
|
7.04 KB |
sha256:7f898b1bbeeb66a35003da25dc1c5bf0614cccdf50c0d0f723a79585a2c73204
|
|
|
ctrf-test-report-node-24
|
6.99 KB |
sha256:ae1b3419b3acc777dce93801852cb422145dbc440ad78525a8586e08daacdfbe
|
|