Everything on the schedule should be confirmed by the 28th at the latest!
The Link:
https://docs.google.com/spreadsheets/d/1yh_N0KZM_W3Qp9SJLj0NZoZ26jN9j6IK1phCX5HKP4g/edit#gid=0
Notes when slotting things:
-
Don't include the "BoF By CUSEC" slots yet
-
Workshops without a company associated with the slot can be added later
-
All speaker slots are confirmed so they can all go in even if there is no speaker attached yet (This can be changed later)
-
Gather people to the hall is a note for us, not for the schedule.
-
Locations and such can be added later as well when those are confirmed
Everything on the schedule should be confirmed by the 28th at the latest!
The Link:
https://docs.google.com/spreadsheets/d/1yh_N0KZM_W3Qp9SJLj0NZoZ26jN9j6IK1phCX5HKP4g/edit#gid=0
Notes when slotting things:
Don't include the "BoF By CUSEC" slots yet
Workshops without a company associated with the slot can be added later
All speaker slots are confirmed so they can all go in even if there is no speaker attached yet (This can be changed later)
Gather people to the hall is a note for us, not for the schedule.
Locations and such can be added later as well when those are confirmed