Skip to content

fix(ci): resolve lint errors, upgrade actions to Node.js 24 #11

fix(ci): resolve lint errors, upgrade actions to Node.js 24

fix(ci): resolve lint errors, upgrade actions to Node.js 24 #11

Triggered via push March 23, 2026 03:54
Status Failure
Total duration 1m 24s
Artifacts

ci.yml

on: push
Matrix: unit
Fit to window
Zoom out
Zoom in

Annotations

5 errors
unit (3.10)
Process completed with exit code 1.
unit (3.12)
The strategy configuration was canceled because "unit._3_10" failed
unit (3.12)
Process completed with exit code 1.
unit (3.11)
The strategy configuration was canceled because "unit._3_10" failed
unit (3.11)
The operation was canceled.