Skip to content

Merge pull request #68 from python-ellar/dependabot/pip/pillow-gte-10… #299

Merge pull request #68 from python-ellar/dependabot/pip/pillow-gte-10…

Merge pull request #68 from python-ellar/dependabot/pip/pillow-gte-10… #299

Triggered via push October 4, 2025 07:05
Status Failure
Total duration 39s
Artifacts

test_full.yml

on: push
codestyle
18s
codestyle
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
codestyle
Process completed with exit code 2.
test (3.8)
Process completed with exit code 2.
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_8" failed
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_8" failed
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_8" failed
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_8" failed