Skip to content

chore(deps): lock file maintenance #10407

chore(deps): lock file maintenance

chore(deps): lock file maintenance #10407

Triggered via push March 18, 2026 08:28
Status Failure
Total duration 1m 28s
Artifacts

build.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Tests (Node.js v20.9.0, ubuntu)
Process completed with exit code 1.
Tests (Node.js v24, windows)
The strategy configuration was canceled because "tests._20_9_0_ubuntu" failed
Tests (Node.js v24, windows)
The operation was canceled.
Tests (Node.js v24, ubuntu)
The strategy configuration was canceled because "tests._20_9_0_ubuntu" failed
Tests (Node.js v24, ubuntu)
The operation was canceled.
Tests (Node.js v22, ubuntu)
The strategy configuration was canceled because "tests._20_9_0_ubuntu" failed
Tests (Node.js v22, ubuntu)
The operation was canceled.
Tests (Node.js v25, ubuntu)
The strategy configuration was canceled because "tests._20_9_0_ubuntu" failed
Tests (Node.js v25, ubuntu)
The operation was canceled.
Tests (Node.js v24, macos)
The strategy configuration was canceled because "tests._20_9_0_ubuntu" failed
Tests (Node.js v24, macos)
The operation was canceled.