Skip to content

Final-Project-ROS2/final-project-deliverables

Repository files navigation

Presentation Structure

Presentation Slides

Tracking Sheet

PLEASE UPDATE THE TRACKING SHEET


0. Title Slide

Slides: 1
Duration: 20-30 sec

  • Project title (clear and specific)
  • Team member names, advisor, program
  • One strong visual (system photo or architecture thumbnail)

1. Problem Statement [Pooh]

Slides: 1
Duration: 30 sec

  • Define the real-world problem in one sentence
  • Explain why existing workflows are difficult or inefficient

2. Potential Applications [Pory]

Slides: 1
Duration: 1 min

  • Identify the domain and target users
  • Show 2-3 practical use scenarios
  • Explain impact: time savings, safety, accessibility, or reliability

3. SOTA, Related Work, and Gap Analysis [Kong]

Slides: 4
Duration: 2 min 30 sec

3.1 Existing Industry Solutions

  • What current products/systems can already do
  • Their deployment strengths (speed, maturity, robustness)

3.2 Academic Approaches

  • Key methods from papers most related to your pipeline
  • Report representative metrics and assumptions

3.3 Limitations and Gaps

  • What breaks in your target conditions
  • Constraints not handled well (latency, hardware limits, task complexity)

3.4 Gap-to-Contribution Mapping

  • Comparison: approach vs capability vs limitation
  • Clear statement of your technical contribution

4. System Requirements and Engineering Process [MB]

Slides: 1
Duration: 30 sec

  • Functional requirements (what the system does)
  • Non-functional requirements (latency, reliability, hardware constraints)
  • Engineering workflow: iterations, experiments, failures, fixes

5. First-Semester Subsystem Results (ASR / Vision / Planning)

5.1 ASR Module [Pory]

Slides: 1
Duration: 30 sec

  • Diagram: ASR pipeline
  • Model and technology used
  • System design

5.2 Vision Module [MB]

Slides: 1
Duration: 1 min

  • Diagram: Vision Pipeline
  • Model and technology used
  • System design

5.3 Planning Module [Kong]

Slides: 1
Duration: 30 sec

  • Diagram: Planning Pipeline
  • Model and technology used
  • System design

6. Overall System Architecture [Kong]

Slides: 1
Duration: 30 sec

  • End-to-end architecture diagram
  • Data flow: microphone/camera -> perception -> planner -> robot
  • Interface points between modules

7. First-Semester Demo [Kong]

Slides: 1
Duration: 1 min

  • Short demo clip or image sequence
  • One sentence of context before playback
  • Highlight one successful behavior and one observed limitation

8. Second-Semester Improvements (Hardware / Vision / Speech / Planning)

8.1 Hardware Setup [Pory]

Slides: 1
Duration: 1 min

  • Setup photo with labeled components
  • Hardware design and setup

8.2 Vision Module Improvements [MB]

Slides: 1-3
Duration: 1 min 30 sec

  • What changed (model, preprocessing, training data)
  • Updated pipeline diagram

8.3 Speech Module Improvements [Pooh]

Slides: 1
Duration: 1 min

  • Explain newly implemented TTS
  • Diagram: TTS pipeline
  • How it interface with the system

8.4 Planning Improvements [Kong]

Slides: 1-2
Duration: 1 min 30 sec

  • Design and implementation of new approach
  • Diagram: Comparison between all approaches

9. Final Result Demo [Kong]

Slides: 1
Duration: 1 min

  • Final integrated demo
  • Explain planning process, task decomposition, primitive combinations
  • End with one sentence on achieved goal

10. Final Subsystem Results (Speech / Vision / Planning)

10.1 Speech Module [Pory]

Slides: 1-2
Duration: 30 sec

  • Benchmark results
  • Limitations

10.2 Vision Module [MB]

Slides: 1-2
Duration: 1 min 30 sec

  • Benchmark results
  • Limitations

10.3 Planning Module [Kong]

Slides: 1-2
Duration: 1 min 30 sec

  • Benchmark results
  • Limitations

11. Overall System Results [Kong]

Slides: 1
Duration: 1 min

  • Benchmark results
  • Limitations

12. Project Management Timeline [MB]

Slides: 1
Duration: 30 sec

  • Milestone timeline (planning, implementation, integration, testing)
  • Ownership matrix (who led each subsystem)
  • Final delivery status against original plan

13. Future Work and Improvements [Pooh]

Slides: 1
Duration: 30 sec

  • Potential improvements based on limitations

About

No description, website, or topics provided.

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

 
 
 

Contributors