PLEASE UPDATE THE TRACKING SHEET
Slides: 1
Duration: 20-30 sec
- Project title (clear and specific)
- Team member names, advisor, program
- One strong visual (system photo or architecture thumbnail)
Slides: 1
Duration: 30 sec
- Define the real-world problem in one sentence
- Explain why existing workflows are difficult or inefficient
Slides: 1
Duration: 1 min
- Identify the domain and target users
- Show 2-3 practical use scenarios
- Explain impact: time savings, safety, accessibility, or reliability
Slides: 4
Duration: 2 min 30 sec
- What current products/systems can already do
- Their deployment strengths (speed, maturity, robustness)
- Key methods from papers most related to your pipeline
- Report representative metrics and assumptions
- What breaks in your target conditions
- Constraints not handled well (latency, hardware limits, task complexity)
- Comparison: approach vs capability vs limitation
- Clear statement of your technical contribution
Slides: 1
Duration: 30 sec
- Functional requirements (what the system does)
- Non-functional requirements (latency, reliability, hardware constraints)
- Engineering workflow: iterations, experiments, failures, fixes
Slides: 1
Duration: 30 sec
- Diagram: ASR pipeline
- Model and technology used
- System design
Slides: 1
Duration: 1 min
- Diagram: Vision Pipeline
- Model and technology used
- System design
Slides: 1
Duration: 30 sec
- Diagram: Planning Pipeline
- Model and technology used
- System design
Slides: 1
Duration: 30 sec
- End-to-end architecture diagram
- Data flow: microphone/camera -> perception -> planner -> robot
- Interface points between modules
Slides: 1
Duration: 1 min
- Short demo clip or image sequence
- One sentence of context before playback
- Highlight one successful behavior and one observed limitation
Slides: 1
Duration: 1 min
- Setup photo with labeled components
- Hardware design and setup
Slides: 1-3
Duration: 1 min 30 sec
- What changed (model, preprocessing, training data)
- Updated pipeline diagram
Slides: 1
Duration: 1 min
- Explain newly implemented TTS
- Diagram: TTS pipeline
- How it interface with the system
Slides: 1-2
Duration: 1 min 30 sec
- Design and implementation of new approach
- Diagram: Comparison between all approaches
Slides: 1
Duration: 1 min
- Final integrated demo
- Explain planning process, task decomposition, primitive combinations
- End with one sentence on achieved goal
Slides: 1-2
Duration: 30 sec
- Benchmark results
- Limitations
Slides: 1-2
Duration: 1 min 30 sec
- Benchmark results
- Limitations
Slides: 1-2
Duration: 1 min 30 sec
- Benchmark results
- Limitations
Slides: 1
Duration: 1 min
- Benchmark results
- Limitations
Slides: 1
Duration: 30 sec
- Milestone timeline (planning, implementation, integration, testing)
- Ownership matrix (who led each subsystem)
- Final delivery status against original plan
Slides: 1
Duration: 30 sec
- Potential improvements based on limitations