Skip to content

Pull requests: openshift/release

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Add e2e-aws-spot periodic job for HyperShift spot instance verification (OCPSTRAT-1677) do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#76440 opened Mar 18, 2026 by zhfeng Draft
16 tasks
Exclude images on app.ci to workaround ComparisonError approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76439 opened Mar 18, 2026 by liangxia Loading…
Update maistra/istio builder image needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#76438 opened Mar 18, 2026 by openshift-service-mesh-bot Loading…
Split gcp mco g1g2 to p1p2p3 4.16
#76437 opened Mar 18, 2026 by HarshwardhanPatil07 Loading…
Split gcp mco g1g2 to p1p2p3 4.17
#76436 opened Mar 18, 2026 by HarshwardhanPatil07 Loading…
Remove duplicate ClusterRoleBinding openshift-release-controller-developers-binding approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76432 opened Mar 18, 2026 by liangxia Loading…
Adding quota slices for ARO classic e2e tests needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76429 opened Mar 17, 2026 by rachelvweber Loading…
feat: add e2e conformance test step for Konflux on OpenShift do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#76428 opened Mar 17, 2026 by amisstea Draft
ROSA-683: Add rosa-e2e nightly periodic job approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#76427 opened Mar 17, 2026 by dustman9000 Loading…
Remove 4.10 - 4.18 vSphere OKD jobs
#76426 opened Mar 17, 2026 by jcpowermac Loading…
GCP-484: Write project IDs to SHARED_DIR before resource creation approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#76425 opened Mar 17, 2026 by cristianoveiga Loading…
2 tasks
chore(kserve): increase parallelism for E2Es approved Indicates a PR has been approved by an approver from all required OWNERS files.
#76422 opened Mar 17, 2026 by israel-hdez Loading…
[DEBUG] [DO NOT MERGE] approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#76420 opened Mar 17, 2026 by tbuskey Loading…
Sync Serverless CI config/ needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#76419 opened Mar 17, 2026 by serverless-qe Loading…
telco5g: orion configuration for oslat test
#76418 opened Mar 17, 2026 by abraham2512 Loading…
[openshift-psap/topsail-ng] fix the secret name approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76417 opened Mar 17, 2026 by kpouget Loading…
JIRA-PENDING: allow conversion webhooks on azure do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#76413 opened Mar 17, 2026 by clebs Draft
hypershift/jira-agent: enable podman build capability approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#76412 opened Mar 17, 2026 by enxebre Loading…
4 tasks
Use determinize-ci-operator for main-promotion validation approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76409 opened Mar 17, 2026 by deepsm007 Loading…
Add Azure custom resource group test for MAO approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#76408 opened Mar 17, 2026 by patrickdillon Loading…
[WIP]CNTRLPLANE-2995: hypershift: fix OADP e2e job for 4.21 with guest OLM placement do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#76406 opened Mar 17, 2026 by wangke19 Loading…
1 of 3 tasks
Update pause image to match changes coming in k8s 1.35 lgtm Indicates that a PR is ready to be merged.
#76405 opened Mar 17, 2026 by jubittajohn Loading…
ProTip! Find all pull requests that aren't related to any open issues with -linked:issue.